page

products

Tianjin Factory direct best price Slitted metal hot dip galvanized steel strip GI steel strip price

Short Description:

Brand Name:Ehong

Place of Origin:Hebei, China

Technique:Cold Rolled

Surface Treatment:galvanized

Application:Structure

Model Number:Steel strip

Width:8-600mm

Tolerance:standard

Grade:Q195 DX51D SGCC


Product Detail

Product Tags

Product Detail

steel strip price1

Product Description

Width

8-600mm

Thickness

0.14-4.0mm

Zinc coating

40-275g

 

Surface

Chromate-free Passivation(Cr3+)

Oiled

Passivation +oiled

 

Standard & Grade

JIS G3302(SGHC SGH340 SGH400 SGH440 SGH490 SGH540 )

EN10346(DX51D DX52D S220GD S250GD S320GD S350GD S550GD )

ASTM A653(CS/A CS/B CS/C SS33 SS37 SS40 SS50 SS55 SS60 SS70 SS80)

Coil ID

508/610mm

Coil Weight

3-5 tons

Products Show

steel strip price2 steel strip price3

Packaging

Packing

Covered with a layer of plastic film and cardboard,packed on the wooden pallets/ iron packing,bound with iron belt

Packing way

One single coils or some small coils into one big coils

Coil ID

508/610mm

Coil Weight

As usual 3-5tons; It could be as your requirements

Shipments

20' container/ by bulk

steel strip price4
steel strip price5
steel strip price6

Company Information

Our Services & Strength

1. Guarantee over 98% pass rate.
2. Commonly loading the goods in 15-20 working days.
3. OEM and ODM orders acceptable
4. Free samples for reference
5. Free drawing and deigns according to clients’ requires
6. Free quality checking for the goods loading together with ours
7. 24 hours on-line service, response within 1 hours

pipe rectangular steel tube11

FAQ

1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .

2. Q: What's your packing methods?
A: Packed in sea-worthy packing ( Inside water-proof paper, outside steel coil ,fixed by steel strip) 

3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.

4. Q: What's your delivery time?
A: 15-25 days after received the advance payment .

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other steel materials?
A: Yes. All related construction materials.

Steel sheet, steel strip, roofing sheet, PPGI,PPGL ,steel pipe and steel profiles.   


  • Previous:
  • Next:

  • Write your message here and send it to us