Tianjin Supplier available for construction telescopic shoring Scaffolding Metal Prop adjustable steel prop
Product Detail
		    
			Product Description
		    
			Adjustable steel shoring prop
1.) common adjustable range (closed-extended) 1.6m-2.9m,1.7m-3.0m,1.8m-3.2m,2.0m-3.6m 2.2m-4.0m,2.4m-3.9m,2.5m-4.5m,2.6m-5.0m
 2.) diameter range on tube (inner/outer) dia. 40/48mm, dia.48/56mm, dia.48/60mm
 3.) thickness range on tube 1.6mm,1.8mm,2.0mm,2.5mm,3.0mm
 4.) top/base plate size 120x120x3.75mm/4.5mm/5mm
5.) surface finish painted, powder coated, zinc-plated, hot dip galvanization
 6.) all technical specification are supplied as per your request.
 7.) material: Q235/Q255/Q345
 8.) type: light duty/medium duty/heavy duty
 9.) inspection: by ourselves or by SGS or B.V or others
 10.) delivery time: within 20 days after confirming the order
Detailed Images
| 
 Min(m)  | 
 Mx(m)  | 
 Inner tube (mm)  | 
 outer tube  | 
| 
 1.4  | 
 2.7  | 
 48*2  | 
 60*2  | 
| 
 2  | 
 3.6  | 
 48*2  | 
 60*2  | 
| 
 2.2  | 
 4  | 
 48*2  | 
 60*2  | 
| 
 3  | 
 5  | 
 48*2  | 
 60*2  | 
		    
			| 
 Min(m)  | 
 Mx(m)  | 
 Inner tube  | 
 Inner tube  | 
| 
 0.8  | 
 0.4  | 
 40*1.8  | 
 48*1.8  | 
| 
 2  | 
 3.6  | 
 4.*1.8  | 
 48*1.8  | 
| 
 2.2  | 
 4  | 
 40*1.8  | 
 48*1.8  | 
| 
 3  | 
 5  | 
 40*1.8  | 
 48*1.8  | 
		    
			| 
 Min(m)  | 
 Mx(m)  | 
 Inner tube  | 
 Inner tube  | 
| 
 1.6  | 
 2.2  | 
 48*2  | 
 56*2  | 
| 
 1.8  | 
 3.1  | 
 48*2  | 
 56*2  | 
| 
 2.0  | 
 3.6  | 
 48*2  | 
 56*2  | 
| 
 2.2  | 
 4.0  | 
 48*2  | 
 56*2  | 
		    
			
		    
			Packing & Delivery
		    
			
		    
			Related Products
		    
			Scaffolding frame
		    
			Scaffolding plates
		    
			Scaffolding frame
Company Information
Tianjin Ehong International Trade Co.,Ltd is the trading office with 17 years export experience. And the trading office exported a wide range of steel products with best price and high quality products.
		    
			FAQ
Q: Are u a manufacturer?
A: Yes, we are FACTORY with 3 production plants in Daqiuzhuang village, Tianjin city, China
Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable
Q:What's your packing methods?
A: Packed in bundle or bulk
Q: Can you supply other scaffolding materials
A: Yes. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding Pipes , hot dipped galvanized/Pre-galvanized /black.
(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) steel coupler (pressed/drop forged coupler)
(5) Steel Plank With Hooks Or Without Hooks
(6) Screw Adjustable Base Jack
(7) Construction Metal Formwork
				










