page

News

What are the advantages of steel sheet pile in the process of use?

The predecessor of steel sheet pile is made of wood or cast iron and other materials, followed by steel sheet pile simply processed with steel sheet material. In the early 20th century, with the development of steel rolling production technology, people realized that steel sheet pile produced by rolling process has low cost, stable quality, good comprehensive performance, and can be used repeatedly. In the exploration of this concept, the first hot rolled steel sheet pile was born in the world.

Steel sheet pile has unique advantages: high strength, light weight, good Waterproof property; Strong durability, service life up to 20-50 years; Reusable, generally can be used 3-5 times; Environmental protection effect is remarkable, in the construction can greatly reduce the amount of soil and concrete use, effectively protect the land resources; Has a strong function of disaster relief, especially in flood control, collapse, collapse, quicksand rescue and disaster relief, the effect is particularly fast; The construction is simple, the construction period is shortened, and the construction cost is less.

sheet pile

In addition, steel sheet pile can deal with and solve a series of problems in the process of excavation. The use of steel sheet pile can provide the necessary safety, and (disaster rescue) timeliness is strong; Can reduce the space requirements; Not subject to weather conditions; In the process of using steel sheet piles, the complex process of checking material or system performance can be simplified; Ensure its adaptability, good interchangeability.

IMG_9775

It has so many unique functions and advantages, so steel sheet pile is used in a wide range of applications, such as in the permanent structure of the building, can be used for wharf, unloading yard, embankment revetment, parapet, retaining wall, breakwater, diversion bank, dock, gate and so on; On the temporary structure, it can be used to seal the mountain, temporary bank expansion, flow cut-off, bridge cofferdam construction, large-scale pipeline laying temporary trench excavation retaining earth, retaining water, retaining sand wall, etc. In flood fighting and rescue, it can be used for flood control, landslide prevention, collapse prevention and quicksand prevention.


Post time: May-30-2023