China Hot Sale Large Diameter ASTM A252 GR.B Spiral Welded Carbon Steel Pipe SSAW Pipe for Pile Foundation Works Manufacturer and Supplier | Ehong
page

products

Hot Sale Large Diameter ASTM A252 GR.B Spiral Welded Carbon Steel Pipe SSAW Pipe for Pile Foundation Works

Short Description:

Feature highlights: APl Certified carbon steel spiral pipe with high strength, capable of withstanding large pressure and offering excellent welding performance, Suitable for oil, aas, water supply, and structural applications. Feaures anti-corrosion coatings like 3PE and FBE, various surface treatments, and meets RoHS compliance ensuringenvironmental safety and market access.


Product Detail

Product Tags

详情页banner

Product Detail

epoxy
Black painting
3pe

Why Choose Spiral Welded Pipe?

Under the same pressure conditions, the stress of the spiral welded seam is smaller than that of the straight seam, which is 75% to 90% of that of the straight seam welded pipe, so it can withstand greater pressure. Compared with the straight seam welded pipe of the same outer diameter, the wall thickness can be reduced by 10% to 25% under the same pressure. The size is accurate, the general diameter tolerance does not exceed 0.12%, the deflection is less than 1/2000, and the ovality is less than 1%. Generally, the sizing and straightening process can be omitted. Continuous production is possible. In theory, long steel pipes can be produced, with small head and tail loss, and can increase the metal utilization rate by 6% to 8%. The equipment is light in weight and low initial investment.

Specification

Product Name
Spiral Steel Pipe/Tube
Wall Thickness
2.5MM~26MM as the requirement
Outer Diameter
159MM~3420MM
Length
5.8m,6m,11.8m 12m or as customer's actual reques
External Coating
PE/2PE/3PE
Standard
API5L, ASTM A106 Gr.B, ASTM A53 Gr.B, ASTM A270, ASTM A249, ASTM A511,ASTM A778 ,ASTM A312,ASTM A358,ASTM A409,ASTM A213,ASTM
A790,ASTM A268,ASTM A269,ASTM A554,ASTM B338,ASTM B673,ASTM B674,ASTM B677,ASTM B675, ASTM B676, ASTM B690,ASTM A928,ASME
B36.19,ASMEB36.10,ASTMA179/A192/A213/A210/370WP91,WP11,WP2
GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013,GB/T8163-2008, GB8162-2008,GB/T17396-2009
EN10216-5,EN10217-7,DIN 17456,DIN 17458
JIS G3463,JIS G3119,JIS G3446,JIS G3218,JIS G3258,JIS G3448,JIS H4631
Grade
Q195 = S195 / A53 Grade A
Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 /ST42.2
Q345 = S355JR / A500 Grade B Grade C
Packing
Bundle, or with all kinds of colors PVC or as your requirements
Pipe Ends
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
Surface Treatment
Prime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)
Product Application
1. Piling project
2. Heat-supply project
3. Conveying drinking water,drainage,coal gas,fuel gas, mine slurry and other low & middle pressure fluids
4. API5L Petroleum and natural gas pipeline
5. Chemistry industry
6.Electric power engineering circulating pipe
Origin
Tianjin China
Hydropower Station2

Advantages of spiral welded pipe
(1) It is possible to use the same width of strip steel to produce steel pipes of different diameters, and also to use narrower strips to produce large-diameter steel pipes.
(2) Under the same pressure condition, the stress of spiral welded seam is smaller than that of straight seam welded seam, which is 75% to 90% of that of straight seam welded pipe, so it can withstand greater pressure. Compared with straight seam welded pipe of the same large diameter, the wall thickness can be reduced by 10% to 25% under the same pressure.
(3) Dimensional accuracy, diameter tolerance of not more than 0.12%, deviation of less than 12,000, ellipticity of less than 1%, generally eliminate the sizing and straightening process.
(4) Continuous production, theoretically can produce long steel pipe, small head and tail loss, metal utilization can be increased by 6% to 8%.

Our Services

Hydropower Station5
Hydropower Station6
Hydropower Station7
Hydropower Station8

Packaging & Shipping

spiral pipe(30)
SSAW Pipe07
spiral pipe(25)

Product Application

微信图片_20230306154058
微信图片_20230306154105
微信图片_20230306154117
Product Application

Company Introduction

优势团队照-红
证书
photobank (6)

FAQ

Q: How can I get a quote from you?
A: You can leave us a message or send us an e-mail, we will reply you in time, you can also find our contact information on the contact page.

Q: What is your delivery time?
A: Delivery time is usually about 1 month, if we have stock, we can ship faster.

Q: How do you guarantee that the products I receive are good?
A: We are 100% pre-delivery inspection factory which can guarantee the quality.

Q: How do you build a long term good relationship with us?
A: We keep good quality and competitive price to ensure the benefit of our customers.


  • Previous:
  • Next: